But here goes:
Current Project #1: The 7 Year Sweater
Although I haven't picked up the sweater in about a month, I'm now at the point where I'm ready to section off the stitches for the arms. But somewhere along the way, I've missed a stitch. 1 stitch out of over 300 to account for. I've put things aside until I want to sit down and sort out if the stitch was dropped or just never added in the first place. My husband has waited over 7 years for this sweater, so what's a few more months? I am pleased, however, with the stripes I'm adding in lieu of the snowflake pattern in the original design.
Current Project #2: Hand Dyed Socks
This one is really a half-finished object. And considering I've already worn it to bed one cool night to keep my tootsies warm, I'd hardly call it a work in progress. But I have cast on the second sock using Knitty's Solidago Sock pattern, so that is a start. The Briggs and Little Sport wool knitted up quite nicely, although I am concerned that the single ply may not last through normal wear and tear. I'll keep these as bed socks when done.
Current Project #3: New Wrap
Current Project #4: Rainy Day Shawl
Finally, I've been working with some of my handspun incorporating it into the Sunday Sunrise Shawl. My colours aren't as cheery as the original, hence the name for the project. The blue is a gorgeous silk-merino blend by Louet plied with a Noro lace-weight yarn. The multi-coloured is a combination of a rainbow coloured merino and grey faulkland roving. I've been itching to combine the 2 skeins for quite a while, but until recently, had not found an appropriate project. I'll follow the pattern, but if I have a lot of yarn left over, I'll add a more decorative edge. I'm most excited about this one!
No comments:
Post a Comment